Sources
The line behind every figure in W3.
Every figure in this issue traces to a line here, with publisher, publication date where available, and the date I accessed it. All access dates are 2026-11-04. Derived figures (multiples, percent changes, months between dates) are arithmetic on the lines below, and the derivation is stated in the Supports column. Confidence: A primary source opened; B secondary source opened.
Where two sources disagree, both are listed and the disagreement is stated. Company figures are company claims and are labelled as such in the issue.
Transformers and demand
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| T1 | Electric Grid Supply Chain Review: Large Power Transformers and HVDC | US Department of Energy | 2022-02-24 | 82% of LPTs consumed in the US imported, 2019 (printed p. 21, citing Commerce 2020); six US LPT producers in 2020 (p. 21) | A | 2026-10-11 |
| T2 | Supply shortages and an inflexible market give rise to high power transformer lead times | Wood Mackenzie | 2024-04-02 | Average lead time about 50 weeks in 2021, 120 weeks in 2024 (transformers broadly) | A | 2026-11-04 |
| T3 | Power transformers and distribution transformers will face supply deficits of 30% and 10% in 2025 | Wood Mackenzie | 2025-08-14 | Power transformer demand up 116% since 2019 (analyst estimate). A WoodMac opinion piece a day earlier gives a 6% distribution deficit against this release's 10%; not used | A | 2026-11-04 |
| T4 | Transformers in 2026: shortage, scramble or self-inflicted crisis | POWER magazine | 2026-01-02 | Wood Mackenzie Q2 2025 survey: power transformers 128 weeks average. Secondary; the survey itself was not reached | B | 2026-11-04 |
| T5 | PPI: Electric Power and Specialty Transformer Manufacturing, PCU335311335311 | BLS, via FRED | updated 2026-10-15 | Index 255.500 (Jan 2020) to 475.065 (Sep 2026): +85.9%, shown as 86% | A | 2026-11-04 |
| T7 | US transformer market faces severe supply constraints as lead times extend to four years | ESS News | 2026-05-12 | PwC: up to four years for high-capacity units; Wood Mackenzie demand 2019–2025, GSU +274%, substation +116%. (Its "about 80%" price rise is from unnamed experts; not used) | B | 2026-11-04 |
| T8 | Transformer troubles: manufacturing and policy constraints hit US transformer supply | Wood Mackenzie | 2025-08-13 | Demand since 2019: power transformers +116%, GSUs +274% (primary for T7's figures) | A | 2026-11-04 |
| T9 | Electricity Distribution Transformers: Supply, Tariffs, and Policy Options, R48933 | Congressional Research Service | 2026-04-23 | BLS prices for power and distribution transformers up roughly 40% from 2020 to 2024, inflation-adjusted (series "Power and Distribution Transformers, Except Parts"; differs from T5); 25% to 30% of distribution transformers imported; distribution lead times down to 30 weeks by Q2 2025 (Wood Mackenzie); domestic cores get 95% of their steel from one supplier | A | 2026-11-04 |
| T6 | Siemens Energy large power transformer facility, Charlotte | Manufacturing Dive | 2024-02 | $149.8M plant, production targeted early 2026. No first-unit report found | B | 2026-11-04 |
Gas turbines
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| G1 | GE Vernova Q3 2026 results | GE Vernova (SEC Ex. 99) | 2026-10-28 | Gas Power backlog plus slot reservations 116 to 122 GW | A | 2026-11-04 |
| G2 | GE Vernova orders surge as turbine slots tighten through 2030 | Power Engineering | 2026-04-23 | CEO: about three years lead time on new heavy-duty orders | B | 2026-11-04 |
| G3 | Siemens gas turbine backlog nears 70 GW | Utility Dive | 2026-08-10 | CFO: lead times "three years or more" | B | 2026-11-04 |
| G4 | MHI Q1 FY2026 Q&A | Mitsubishi Heavy Industries | 2026-08-06 | Q1 orders scheduled for delivery 2028 to 2030 | A | 2026-08-30 |
| G6 | High demand for gas turbines is pushing out deliveries to 2031, Mitsubishi Power says | Bloomberg, via Energy Connects | 2026-10-27 | Mitsubishi Power Asia Pacific CEO: new orders deliver around 2031; 2028 and 2029 slots almost fully booked | B | 2026-11-04 |
| G5 | GE Vernova announces more than $160 million investment in Greenville | GE Vernova | 2025-01-29 | Gas turbines made in Greenville since 1968 | A | 2026-11-04 |
Grain-oriented electrical steel
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| S1 | ATI Form 8-K | ATI (SEC) | 2016-10-31 | Bagdad, PA GOES finishing facility permanently closed (announced 25 Oct 2016) | A | 2026-11-04 |
| S2 | ATI FY2015 Form 10-K | ATI (SEC) | 2016-02 | GOES idling announced Dec 2015; Louisville OH listed among flat-rolled finishing sites | A | 2026-11-04 |
| S3 | ATI FY2022 Form 10-K and FY2023 Form 10-K | ATI (SEC) | 2023-02 / 2024-02 | Louisville listed through FY2022, absent from FY2023 | A | 2026-11-04 |
| S4 | The Effect of Imports of Transformers and Transformer Components on the National Security (redacted) | Commerce, BIS | 2020-10-15 (posted 2021) | AK Steel the sole US GOES producer; capacity redacted; cores $22M (2015) to $167M (2019); Canada and Mexico over 95% of core imports | A | 2026-11-04 |
| S5 | Cleveland-Cliffs applauds President Trump's ... | Cleveland-Cliffs | 2020-11-02 | AK Steel capacity up to 250,000 net tons a year of electrical steel, Butler and Zanesville combined, GOES and NOES combined | A | 2026-11-04 |
| S6 | DOE bulletin, Butler Works award | DOE EERE | 2026-10-08 | $75M federal award, $200M project, up to 25% more output. WPXI reported $170M; DOE's figure used | A | 2026-11-04 |
| S7 | America makes the wrong steel for its transformer supply chain | Breakthrough Institute | 2026-08-14 | GOES about 20% of a transformer's cost; GOES prices doubled 2020 to 2024; a Butler retrofit or a greenfield GOES mill costs $1–2B either way. Transformer core imports $126M (2018) to $524M (2025). The article says "over 400%"; 524/126 = 4.16×, shown as "about 4×". No trade codes cited | A (for the claim) | 2026-11-04 |
| S8 | Flux Steel Works secures Ohio plant to produce power transformer core steel | Flux Steel Works (PR Newswire) | 2026-09-15 | Former ATI plant, 626,000 sq ft, secured July 2026; >260,000 tons/yr at full production; commercial production planned 2029; >150,000 tons reserved; 200+ jobs. Capex and financing not disclosed | A | 2026-11-04 |
| S9 | fluxsteelworks.com | Flux Steel Works | accessed | About half of capacity in phase 1 | A | 2026-11-04 |
Presses and castings
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| P1 | ASME landmark 89: Wyman-Gordon 50,000-ton hydraulic forging press | ASME | 1983 | 50,000-ton began forging Oct 1955; 35,000-ton from Feb 1955; plant bought from the government 1982 | A | 2025-05-12 |
| P2 | Wyman-Gordon Grafton | Wyman-Gordon | accessed | 50,000- and 35,000-ton presses listed. A listing, not an operating record | A | 2026-11-04 |
| P3 | ASME landmark 71: Alcoa 50,000-ton hydraulic forging press | ASME | 1981 | Built "between 1952 and 1955". Alcoa says 1955 (P4); the issue uses 1955 | A | 2026-11-04 |
| P4 | Alcoa completes and restarts redesigned 50,000-ton press | Alcoa (now Howmet) | 2012-02-13 | $100M rebuild; restart Feb 2012; production began 1955 | A | 2026-11-04 |
| P5 | Weber Metals and Otto Fuchs debut new forge press | Weber Metals (release via Defense Daily) | 2018-10-23 | 60,000-ton press, Paramount CA, $180M (other reports say $170M); Weber is "a division of Otto Fuchs KG of Germany" | A | 2026-11-04 |
| P6 | GAO-22-104154, Navy Shipbuilding industrial base | GAO | 2022-07 | DoD reports FY2018 to FY2020 flagged "fragile market" risk; the definition; $5.5M in FY2018 to preserve casting capability; castings and forgings a DoD-wide priority from 2021 | A | 2026-10-19 |
| P7 | Navy ship construction, repair hampered by lack of suppliers, skilled workers | Seapower (Navy League) | 2022-01-13 | Matt Sermon, executive director, PEO Strategic Submarines: his list of "fragile market sectors" includes castings and forgings. The phrase is the reporter's paraphrase, not a direct quote | A | 2026-11-04 |
Cranes
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| C1 | Joint Homeland Security and China Select Committee port security report | US House (majority staff) | 2024-09 | ZPMC nearly 80% of STS cranes used at US ports; no US manufacturing alternative | A | 2026-11-04 |
| C7 | CRS IF12666 | Congressional Research Service | 2026-08-26 | China makes over 70% of STS cranes globally. (The brief's "about 80% of the world market", from Maritime Executive, is a hedged secondary figure; not used) | A | 2026-11-04 |
| C8 | CBP CSMS #62411889 | US Customs and Border Protection | 2024-09-26 | 25% Section 301 duty on Chinese STS cranes for entries from 2024-09-27 | A | 2026-11-04 |
| C2 | Mitsui E&S news release | Mitsui E&S | 2024-04-11 | Paceco to reestablish final assembly of port cranes in California, the first since 1989 | A | |
| C3 | Mitsui E&S news release | Mitsui E&S | 2025-09-18 | Two STS cranes for TTI, Long Beach | A | 2025-12-06 |
| C4 | Port of Long Beach orders ship-to-shore cranes | Maritime Professional | 2025-09 | The TTI cranes are built in Japan | B | 2026-11-04 |
| C5 | Konecranes establishing network of partners to build full range of port cranes in the United States | Konecranes | 2024-07-29 | Full range of port cranes including STS through US partners | A | 2026-11-04 |
| C6 | PhilaPort Tioga Marine Terminal STS cranes | Philadelphia Inquirer | 2026-02-10 | Four potential bidders could not meet the spec, schedule or budget; BABA waiver sought | B | 2026-11-04 |
Model reference classes
Reference-class sources for the model (Big River Steel, POSCO, JFE, JSW–JFE, qualification time) are in issues/W3/research/step1.md, section B, with their confidence grades. The ones the issue cites by number:
| # | Source | Publisher | Pub date | Supports | Conf. | Archived |
|---|---|---|---|---|---|---|
| M1 | Electrical steel line coming to Big River Steel and U.S. Steel ribbon cutting, Osceola | AIST; U.S. Steel (repost) | 2021-06 / 2023-10-12 | Announced Jun 2021, ribbon cutting Oct 2023: about 28 months, "on time and on budget" | B / A | 2026-11-04 |
| M2 | POSCO completes construction of electrical steel sheet plant at Gwangyang | SteelOrbis | 2024-01-04 | Non-oriented (Hyper NO); construction from Apr 2022; first phase complete, 150,000 t/yr | B | 2026-11-04 |
| M3 | Japan's JFE Steel to triple electrical steel sheet capacity at Kurashiki | SteelOrbis | 2023-05-23 | Non-oriented (EV motors), second expansion; operations within the fiscal year ending Mar 2027 | B | 2026-11-04 |
| M4 | JFE Steel release on the JSW JFE Electrical Steel expansion | JFE Steel | 2025-08-04 | GOES; JV investment Feb 2024; Vijayanagar full production scheduled within 2027 | A | 2026-11-04 |